Professional Experience
- Pot Control System Upgrade – Smelter located in Qatar
- Conduct a detailed site survey and suggest technical options available to the customer for a PCS upgrade- Independent Consultant
- Installation of Pilot with new technology– Smelter located in Abu Dhabi
- Co-develop the PCS with the customer, supply and commission the project for 10 Pots- PCS Specialist
- Supply and commission the PCS for Lne 6–Aluminium Bahrain (ALBA)
- Provide hardware for 424 Pots, associated Network, diagnostics and the full PLC based PCS- PCS Specialist
- Supply and commission the PCS for Creep on Line 1& 3– EGA (Al Taweelah)
- Provide hardware for 14 new Pots in Line 3, associated Network, diagnostics and brown field conversion of two sections (65 pots) replacing Microprocessor to PLC for Line 1- PCS Specialist
- Supply and commission the PCS for brown field conversion of Lines 1&3 – EGA (Jabel Ali)
- Executed the Conversion of 520 Pots from Microcontroller to PLC based PCS- Project Manager
- Supply and commission the PCS for Green field conversion of Line 3- EGA (Al Taweelah)
- Provided green field engineering, installation and commissioning of the PLC based PCS for 444 Pots-Project Manager
- Studies and pilots
- Heat Stress on PCS panels
- Comparison of cooling technologies for enclosures
- Study and trials of PCS components by testing them in the lab, and deploying them on the pot lines.
- Substitution of alternative hardware conducting studies for end-of-life / obsolescence solutions.
- Trials for future technologies such as wireless infrastructure, using new generation of intelligent sensors for the PCS
- Value Engineering by conducting cost benefit analysis on mordernization of PCS
Our Vision
Empowering the next generation of aluminium smelters with intelligent Pot Control System solutions built on integrity, innovation, and technology